Attention:
- Be sure to replace the new gasket between the catalytic converter and the downpipe.
- To prevent leakage, make sure that the gasket and contact surfaces of the nozzles are in good condition. Contact surfaces must be clean and free from scratches.
- Plugs should be removed from any component openings immediately prior to component installation. In addition, new parts must also be removed from the packaging just before installation.
Installation is carried out in the reverse order of removal, observing the required tightening torques.
Bleed hydraulic clutch.
Fill the engine cooling system and remove air from it.
Fill the gearbox with oil.
Using a special station, fill the air conditioning system.
If necessary, add engine oil to the engine.
Check for leaks in various systems.
Tightening torques for threaded connections
Threaded connections | Torque |
Gearbox ground cable bolt | 44 Nm |
Nut of fastening of a cable of weight to a body | 8 Nm |
Bolts of fastening of the left mounting support | 62 Nm |
Nuts of fastening of the left mounting support | 105 Nm |
Bolts of fastening of the right mounting support | 62 Nm |
Rear mount and engine tie rod bolts | 105 Nm |